INFCIRC 193 PDF

admin

INFCIRC/ The text of the Agreement, and of the Protocol thereto, between Belgium, Denmark, the Federal Republic of Germany, Ireland. In INFCIRC/ the formal basis which enables the IAEA to carry out inspections in the EURATOM NNWS is provided by Article Other Articles in the. suspended on 5 April , on which date the agreement of 5 April ( INFCIRC/) between the non-nuclear-weapon States of EURATOM, EURATOM and.

Author: Shabei Malashura
Country: Gabon
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 27 March 2004
Pages: 252
PDF File Size: 2.36 Mb
ePub File Size: 8.37 Mb
ISBN: 546-6-29261-238-2
Downloads: 23846
Price: Free* [*Free Regsitration Required]
Uploader: Grolabar

Czech Office for Standards Metrology and Testing. In connection with the adoption of the new Atomic Act and in accordance with the authorising provisions in this Act, it is necessary to establish, among other things, a system for accounting for and controlling nuclear materials and for reporting data on these materials in relation to the obligations set out in the Atomic Act, and taking into account the existing system that has been proven in practice.

In addition to the relevant provisions of the Atomic Act, this draft implementing decree is also based on earlier legislation, i. Notification language English French Spanish. Notifying Member Czech Republic. Link to full text of notified document https: Dates related to notified measure. Final date for comments. Proposed date of entry into force.

  CASQUEAMENTO EM BOVINOS PDF

Products, objective and reason for add. Objective and Rationale, including the nature of urgent problems where applicable. National security requirements Consumer information, labelling Prevention of deceptive practices and consumer protection Protection of human health or safety Protection of animal or plant life or health Protection of the environment Quality requirements Harmonization Reducing trade barriers and facilitating trade Cost saving and productivity enhancement Not specified Other.

Technical Regulation Article 2. Technical Regulation – Urgent Article 2. Conformity Assessment Procedure Article innfcirc. Conformity Assessment Procedure – Urgent Article 5. Technical Regulation – Local Government Article 3. Notified measure withdrawn or revoked. Content or scope of measure changed. Clerical error in notification. Clerical error in notified measure.

If applicable, name of the local government involved. State Office for Nuclear Safety. Agency or authority designated to handle comments if different from above. Notified under article Type of measure. Draft implementing decree on the accountancy and control of infciirc materials and reporting of information on them 21 pages, in English; 19 pages, in Czech.

Based on authorising provisions in the new Atomic Act, infccirc draft implementing decree governs: The mutual recognition clause is provided in the infirc new Atomic Act.

  EC2303 COMPUTER ARCHITECTURE AND ORGANIZATION LECTURE NOTES PDF

G/TBT/N/CZE//Add.1 – Technical Barriers to Trade

National security requirements Consumer information, labelling Prevention of deceptive practices and consumer protection Protection of human health or safety Protection of animal or plant life or health Protection of the environment. Quality requirements Harmonization Reducing trade barriers and facilitating trade Cost saving and productivity enhancement Not specified Other. Dates of adoption and entry into force. Proposed date of adoption. Derived from the date of adoption of the new Atomic Act which is the law authorizing the adoption of the Decree in questionestimated date: Derived from the date of entry into force of the new Atomic Act; estimated date: Number of days from notification.

Regulation

Comments Less than 45 Days. Comments between 45 and 59 Days.

Not specified, Lapsed or stated as non-applicable. Full text of notified document. Link to full text of notified document.

Subscribe US Now